00:00:00:00— 24 FPS
Haven logo HavenPrinted Homes
Enquire
01Overview 02The Homes 03The Print 04Gallery 05FAQ 06About 07Enquire
00 — THE METHOD
01 / 05
The Method // 48–72 Hours

Printed, Not Poured.

A gantry printer draws the walls in engineered concrete, bead over bead, following the digital blueprint exactly. No forms, no wall framing, a fraction of the waste — and the layers stay visible, a texture no plaster can imitate.

01
The Machine // & The Material

One Continuous Gesture.

A steel gantry frame spans the whole footprint, and a robotic print head rides its rails laying a bead of engineered concrete — a mix thick enough to support itself, so the wall needs no forms and no beams. Each layer sets as the next lands. One machine, one material, one gesture.

ZeroFormwork · framing
Hollow coreServices + insulation
Layer × layerAI print monitoring
02 // From Sketch To Keys

Eight Weeks, Five Steps.

01

Design & Permit

Pick a plan or commission a custom one — the printer follows curves as easily as lines. Soil testing, survey and city permitting run in parallel; permits are the longest single line on the schedule.

Week 0–4
Design studio with scale models of printed homes
02

Site & Foundation

Excavation, utilities, grading and drainage, then a conventional slab with printed-wall anchor geometry — poured, inspected and cured while your print slot is scheduled.

Week 4–6
Prepared sites in a printed-home neighborhood
03

The Print

The gantry assembles over the slab and the house appears — bead over bead, wall by wall, 48–72 hours for a Haven-sized shell. Electricians and HVAC work inside while the walls rise around them.

Week 6 · 48–72 h
Gantry printer printing concrete walls at dawn
04

Roof & Glass

The roof is framed, assembled and set onto the printed shell, then glazing, exterior doors, rough-ins and insulation follow. The walls were finished the day they were printed.

Week 6–7
Printed home courtyard with glazing installed
05

Finish & Keys

Polished concrete floors, oak joinery, linen light — interior finishing, landscaping, final inspection and walkthrough. Two to three weeks of build inside an eight-week project.

Week 7–8
Finished ribbed interior corridor
03 // Why A Printed Wall Wins
0hrs
Structure Print Time

From first bead to standing shell in 48–72 hours. What used to take months of framing now takes days of printing.

0%
Below Conventional Cost

30–40% saved on the build — less material, fewer trades, and the machine doesn't bill overtime.

0%
Construction Waste

The nozzle lays exactly what the wall needs — about 70% less waste than a conventional site, and the offcuts recycle.

0%
Labour Hours

Up to 80% fewer labour hours on the structure. Fire, flood and windstorm meet a monolithic concrete wall — and lose.

04 // Questions

Asked Often.

Is a printed house up to code?

Yes. Printed walls are engineered as reinforced concrete and certified under the same structural codes as any concrete building. Every Haven ships with a full engineering package for your local permit office.

What about plumbing and wiring?

The printed walls are hollow-core — cavities rise with the print exactly where services need to run. Electricians and HVAC crews work inside the shell while it prints, and second-fix openings are cut precisely where the plan calls for them.

Is the roof printed too?

No — the printer draws the walls. The roof is framed conventionally, assembled and set onto the shell, which is why a Haven can carry a proper pitched roofline over printed concrete walls.

Can I paint or plaster the ribbing?

You can — but most owners don't. The layer lines are the signature of the method. We seal them with a mineral finish that deepens the shadow lines.

How does it handle heat, cold and storms?

The hollow printed wall is insulated after the print, giving thermal mass and an airtight envelope. A Haven holds warmth through an Alberta winter, coolness in summer — and is engineered to be disaster-resistant against fire, flood and windstorm.

Where do you print?

We're based in Edmonton, Alberta, with our pilot in Alberta's Industrial Heartland. Current print slots serve Alberta first; join the list and we'll sequence your site.

One Machine One Material One Continuous Gesture Walls In Days